CHAPTER-35
PrisonBuildings
: Classification of works and repairs
Rule 875. -(i) Buildings in prison, are classified as follows:Rs.
Major works costing over
A.-Original work}
Minor works costing over
but not exceeding
petty works costing....
under
B.—Repairs
..
25,000
1,000
...25,000
1,000 or
Special periodical or annual.
(ii) "Original works", include all new constructions whether
entirely new or merely additions and alterations to existing
buildings; all repairs to newly purchased or previously abandoned
buildings required to bring them into use and substitutions of one
kind of work for another, e.g. a tiled for a thatched roof.
(iii) "Special repairs", include the complete renewal of a roof or
floor and repairs, rendered necessary by storm, flood or other
unforeseen accident. Special repair estimates unlike other repair
estimates, do not lapse with the financial year, but remain current
till the completion of the work in the same way, as estimates for
original works.
(iv) "Periodical or annual repair", comprise not only such work
as painting and white-washing, but such miscellaneous repairs as it
may be convenient to carry out the same time.
(v) The Inspector General is competent to convey
administrative approval for works of prison buildings to be carried
out of department grant under the head "28 Jails and convict
settlement-D-Work" upto Rs. 20,000 [Rs. 50,000] and grant
technical sanction to estimate of expenditure on the work of the
nature mentioned above upto Rs. 50,000.
Proposal for an original major works:
Rule 876. (i) Every proposal for major work shall be
accompanied by: (a) an explanation of the requirement:
(b) a brief statement of the general nature and extent of the
work proposed and
(c) rough approximate estimate of the probable cost, and a